SP2012-007 — Warehouse and distribution center expansion in Rockwall, TX
This is an amended site plan for a 6,100 SF expansion of an existing warehouse facility in a Light Industrial zone, bringing the total building to approximately 26,100 SF. The project is a permitted by-right use that meets zoning requirements for height, setbacks, and parking, though the building elevations utilize tilt-up concrete panels rather than the required masonry and stone finishes, consistent with a previously approved exception. Developers should monitor this case if they have interest in similar industrial projects or facade material exceptions in Rockwall's employment centers.
| Case number | SP2012-007 |
|---|---|
| Type | Other |
| Location | 1575 Technology Way, Rockwall, TX |
| Parcel / legal | Lot 1, Block C, Nolan Power Building Addition, City of Rockwall, Rockwall County, Texas |
| Acreage | 2.11 |
| Current zoning | Light Industrial (LI) |
| Proposed use | Warehouse and distribution center expansion |
| Petitioner | Elliott Bogart of Triangle Engineering, LLC |
| Owner | Spencer Shaw of SS Realty, LTD |
| Hearing | 2026-01-13 |
| Hearing body | Planning and Zoning Commission |
| Staff recommendation | approve with conditions |
| Status | new |
Tracking this case? Zoning Firehose emails you the moment cases like this hit any DFW P&Z agenda — days before the hearing. Start a free trial.