← All Mesquite cases · Every DFW P&Z portal we watch
02-162 — Temporary Concrete Batch Plant in Mesquite, TX
This case seeks approval of a Conditional Use Permit (CUP) for a temporary concrete batch plant operating through June 2029 to support TxDOT's reconstruction of the US 80 and IH-635 interchange. The site has direct access to the US Highway 80 service road, minimizing truck traffic on City streets, and operations include dust control and environmental compliance measures. The temporary use will not preclude future commercial/corridor development consistent with the Comprehensive Plan once operations cease.
| Case number | 02-162 |
|---|---|
| Type | Other |
| Location | 3220 E. US Highway 80, Mesquite, TX |
| County | Dallas County |
| Current zoning | Commercial |
| Proposed use | Temporary Concrete Batch Plant |
| Petitioner | Austin Bridge & Road, LP |
| Owner | Austin Bridge & Road, LP. |
| Hearing | 2026-02-09 |
| Hearing body | Planning and Zoning Commission |
| Staff recommendation | approve with conditions |
| Status | new |
Property & nearby activity
Case history
Every time this case appeared on an agenda we watched, and what changed.
- First seen — 2026-07-25: First seen on an agenda (backfilled from our archive) · Planning and Zoning Commission
Other Mesquite rezoning cases
- Z1225-0433 — Multifamily development with +/- 294 units
- Z0425-0392 — Temporary Concrete Batch Plant (continued use)
- Z1025-0424 — Accessory Dwelling Unit (ADU) with modifications to exceed maximum size of 1,000 sq ft by 200 sq ft (total 1,200 sq ft) and exceed maximum height of 15 feet by 3 feet (total 18 feet)
- Z0525-0400 — 36-unit multifamily development
- Z1125-0430 — Coin-operated amusement game room
Tracking this case? Zoning Firehose emails you the moment cases like this hit any DFW P&Z agenda — days before the hearing. Start a free trial.